Marketing-Börse PLUS - Fachbeiträge zu Marketing und Digitalisierung
print logo

At a CAGR of 14.8%, Data Center Construction Market in Southeast Asia 2016-2020, Trends, Future Direction and Operating

The report provides a basic overview of the Data Center Construction Market in Southeast Asia including definitions, classifications, Growth & Trends
MarketsandMarkets™ | 29.07.2016

Data Center Construction Market in Southeast Asia 2016-2020 Size and Share Published in 2016-03-24 Available for US$ 2500 at Researchmoz.us

Description

The construction of a data center
encompasses design, architecture, installation of electrical and mechanical systems, and general construction works.

The demand for cloud-based services and the growth of the Internet of Things (IoT) are prompting enterprises in Southeast Asia to construct data centers to gain a competitive edge. Complexities associated with business applications have increased because of enormous growth in data volumes, triggering an increased need for the construction and renovation of data centers. In addition, enterprises are focusing on the building of green data center facilities to reduce power consumption and carbon dioxide emissions.

Technavios analysts forecast the data center construction market in Southeast Asia to grow at a CAGR of 14.8% during the period 2016-2020.

Covered in this report

The report covers the present scenario and the growth prospects of the data center construction market in Southeast Asia for 2015-2020. To calculate the market size, the report considers the revenue generated from the building of new data centers (including modular data center facilities) and the renovation of data centers.

The market is divided into the following segments based on electrical construction:

UPS

Energy storage equipment

Generators

Transfer switches and switchgear

Get a Free Sample Copy of the Report: http://www.researchmoz.us/enquiry.php?type=S&repid=685255

Technavio's report, Data Center Construction Market in South East Asia 2016-2020, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.

Key vendors

CSF Group

M+W Group

Nakano Construction

Sara-Timur

Wah Loon Engineering

Other prominent vendors

Alphamatic Systems

AWP Architects

CPG Consultants

DSCO Group

Kienta Engineering Construction

Kinetics Corporate

Nova

PWS (Malaysia)

Sato Kogyo

Inquiry on this report: http://www.researchmoz.us/enquiry.php?type=E&repid=685255

Market driver


Increased demand for cloud-based services and big data analytics

For a full, detailed list, view our report

Market challenge

Poor analysis of business requirements

For a full, detailed list, view our report

Market trend

Green data centers

For a full, detailed list, view our report

Key questions answered in this report

What will the market size be in 2020 and what will the growth rate be?

What are the key market trends?

What is driving this market?

What are the challenges to market growth?

Who are the key vendors in this market space?

What are the market opportunities and threats faced by the key vendors?

What are the strengths and weaknesses of the key vendors?

You can request one free hour of our analysts time when you purchase this market report. Details are provided within the report.

Browse All ICT Market Research Reports at: http://www.researchmoz.us/ict-market-reports-96.html

About ResearchMoz


ResearchMoz is the world’s fastest growing collection of market research reports worldwide. Our database is composed of current market studies from over 100 featured publishers worldwide. Our market research databases integrate statistics with analysis from global, regional, country and company perspectives.

Contact Us:

ResearchMoz
Mr. Nachiket Ghumare, +1-518-621-2074
USA-Canada Toll Free: 866-997-4948
[email protected]
http://www.researchmoz.us/






Img of MarketsandMarkets™
About the tenderer: MarketsandMarkets™

MarketsandMarkets is the largest market research firm worldwide in terms of annually published premium market research reports.

No spam. Unsubscribe anytime.